WHEATSTONE BRIDGE SLIDE WIRE 1m ALUM. BASE
- EM4500-001
The IEC Wheatstone Bridge is the classic instrument for measuring resistance using the 'balanced bridge' method. IEC makes both 1m and 1/2m long bridges. The 1m bridge has 4x gaps and the 1/2m bridge has 2 gaps for external component connection. The base is made from aluminium channel to avoid warping and cracking found with timber. A knife edge 'Jockey' is included and the 'Advance' resistance wire is stretched over a metric rule.
Instruction Sheet